• Impulse wellesley

Wellesley construction update: Rockland Street bridge set to reopen by year-end 2012

Rockland Street Bridge October 2012

via WPDphoto

The Rockland Street bridge is set to re-open by the end of December, according to the Massachusetts Department of Transportation.

After a slow start and some classic stuff such as a person driving onto the pedestrian bridge, much progress has been made in recent months.The bridge was initially expected to re-open in September.

Mike Verseckes, with Mass DOT public affairs, says recent highlights include: “The bridge deck has been placed, the approaches are being worked on, and guardrail has to be installed.” Some outstanding utility work remains, he says.

This entry was posted in Construction. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.
  • Wellesley TenAcre, Fall 2015

Post a Comment

Your email is never published nor shared. Required fields are marked *


You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>