This update about the Wellesley High School Track & Field project from the Department of Public Works. All photo credits to the DPW.
The contractor continues to install the drainage system and grade the field’s gravel sub-base. The concrete was set for the field post footings, and the concrete forms were set for the ticket booth footings.