• Sign up for free email newsletter
  • Advertise
  • Donate to support our work
  • Events calendar
  • About Us
 
Pinnacle, Douglas Elliman, Wellesley
 
Wellesley Hills Dental

The Swellesley Report

Since 2005: More than you really want to know about Wellesley, Mass.

  • Restaurants, sponsored by black & blue
  • Camps, sponsored by NEOC
  • Wellesley Square
  • Private Schools, sponsored by Prepped and Polished
  • Public Schools, sponsored by Sexton
  • Preschools, sponsored by Longfellow, Wellesley
  • School news
  • Kid stuff
  • Top 10 things to do
  • Business news
  • Worship
  • Letters to the editor
  • Guidelines for letters to the editor
  • Live gov’t meetings
  • Sports schedules & results
  • Deland, Gibson’s Athlete of the Week
  • Deaths
  • Housing
  • Medical providers—sponsored by FIXT Dental
 

Top Stories

Air conditioning & EV buses inform School Committee’s Special Town Meeting articles
Paying tribute to loooongtime DPW employee Smitty Rogers
Yet more new fitness & wellness studios

Advertisements

Needham Bank, Wellesley
FIXT
Down Under, Wellesley
Legal Notice

MassDOT to hold in-person public meeting for status update on Routes 27/9 project

March 22, 2026 by admin

THE COMMONWEALTH OF MASSACHUSETTS

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION – HIGHWAY DIVISION

NOTICE OF AN IN-PERSON PUBLIC INFORMATION MEETING

Project File No. 605313

An In-Person Public Information Meeting will be hosted at Wilson Middle School, at 22 Rutledge Road, Natick, MA, 01760, to present a status update for the Route 27 and Route 9 Bridge Replacement and Interchange Improvements in Natick.

WHEN: Thursday, March 26, 2026, 6:30 p.m. – 8:30 p.m.

WHERE: Wilson Middle School, 22 Rutledge Road, Natick, MA, 01760

PURPOSE: The purpose of this meeting is to update the public on the status of the bridge replacement project and interchange improvements. MassDOT will present the project background, the schedule and construction phasing, the right-of-way process, project landscaping, public involvement, and next steps. The meeting will include a presentation by the project team followed by a question-and-answer session. All views and comments will be reviewed and considered to the maximum extent possible.

PROJECT: This project will include the replacement of the structurally deficient Bridge No. N-03-020 which carries North Main Street (Route 27) over Worcester Street (Route 9) and consists of the reconfiguration of the interchange to a modified Diverging Diamond Interchange (DDI) configuration. The reconfiguration will provide safety improvements, reduced traffic congestion through the interchange, and improved bicycle and pedestrian facilities using separated shared use paths and sidewalks. The project length is approximately 3,850 feet along Route 9 and 2,120 feet along Route 27. The work will also include transit stops along Route 27 and Route 9 along with reconstructed sidewalks, drainage improvements, traffic signals, retaining walls, utility relocations, signing, roadway lighting, and landscaping.

This meeting is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of charge upon request (e.g., interpreters in American Sign Language and languages other than English, live captioning, videos, assistive listening devices and alternate material formats), as available. For accommodation or language assistance, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580), TTD/TTY at (857) 266-0603, fax (857) 368-0602 or by email (MassDOT.CivilRights@dot.state.ma.us). Requests should be made as soon as possible prior to the meeting, and for more difficult to arrange services including sign-language, CART, language translation, or interpretation, requests should be made at least ten business days before the meeting.

This meeting will be posted, or a cancellation announcement posted, on the internet at:
https://www.mass.gov/orgs/highway-division/events

JONATHAN GULLIVER CARRIE LAVALLEE, P.E.
HIGHWAY ADMINISTRATOR CHIEF ENGINEER

Filed Under: Legal notices, Transportation

     

Advertisements

black & blue, Wellesley
Olive Tree Medical, Wellesley
Haskins Automotive, Wellesley
MIT Museum, Cambridge

Wellesley Planning Board Notice of Online Public Hearing on Project of Significant Impact Special Permit Application (Babson College–Executive Lodge & Conference Center): Monday, May 5, 6:30pm

April 24, 2025 by admin

WELLESLEY PLANNING BOARD NOTICE OF PUBLIC HEARING ON A PROJECT OF SIGNIFICANT IMPACT SPECIAL PERMIT APPLICATION FOR PSI-25-01 – BABSON COLLEGE-EXECUTIVE LODGE & CONFERENCE CENTER MONDAY, MAY 5, 2025, 6:30 P.M.

ONLINE VIRTUAL MEETING

The online meeting will also be streaming live and will be telecast live on Comcast channel 8 and Verizon channel 40. The meeting will also be recorded and available for later viewing on Wellesley Media.

The information to access the virtual meeting will be available on the Planning Board agenda, which will be posted at least 48 hours in advance of the Public Hearing. The agenda can be found at the following link: https://wellesleyma.gov/AgendaCenter/Planning-Board-15

In accordance with Chapter 40A, Section 9, of the Massachusetts General Laws, and Section 5.6 of the Zoning Bylaw, the Wellesley Planning Board, acting as Special Permit Granting Authority, will hold a public hearing on the application of Babson College, for a Special Permit for a Project of Significant Impact project located at 231 Forest Street, Wellesley, MA 02482 (also known as 6 Bryant Way). The proposed project will entail the redevelopment of an existing parking garage into a new Executive Lodge and Conference Center (the project), which will consist of approximately 77,600 square feet of hospitality space, including guestrooms, function/meeting areas, a fitness center and restaurant space.

The purpose of the Project of Significant Impact (PSI) Special Permit is to address off-site impacts of projects involving construction of 10,000 or more square feet of floor area in seven specific areas: water, sewer, storm drainage, electric power, solid waste, fire protection and life safety, and traffic and pedestrian safety. The permitting review is administered by the Planning Board in accordance with Section 5.6, Project Approval, of the Zoning Bylaw, and the Rules Relative to the Issuance of Special Permits adopted by the Planning Board.

Residents with any questions or who are seeking to participate in the hearing are encouraged to contact the Planning Director at earbeene@wellesleyma.gov prior to the meeting.

The submission and plans may be viewed on the Planning Department webpage at: http://wellesleyma.gov/1479/Planning-Board-Applications-Under-Review

Eric Arbeene, AICP

Planning Director

(WT-4/17/25 & 4/24/25)

Filed Under: Babson College, Government, Legal notices

Page Waterman, Natick
London Harness, Wellesley
Longfellow, Wellesley

Wellesley Planning Board Notice of Online Public Hearing on Project of Significant Impact Special Permit Application (Babson College–Executive Lodge & Conference Center): Monday, May 5, 6:30 p.m.

April 17, 2025 by admin

WELLESLEY PLANNING BOARD NOTICE OF PUBLIC HEARING ON A PROJECT OF SIGNIFICANT IMPACT SPECIAL PERMIT APPLICATION FOR PSI-25-01 – BABSON COLLEGE-EXECUTIVE LODGE & CONFERENCE CENTER MONDAY, MAY 5, 2025, 6:30 P.M.

ONLINE VIRTUAL MEETING

The online meeting will also be streaming live and will be telecast live on Comcast channel 8 and Verizon channel 40. The meeting will also be recorded and available for later viewing on Wellesley Media.

The information to access the virtual meeting will be available on the Planning Board agenda, which will be posted at least 48 hours in advance of the Public Hearing. The agenda can be found at the following link: https://wellesleyma.gov/AgendaCenter/Planning-Board-15

In accordance with Chapter 40A, Section 9, of the Massachusetts General Laws, and Section 5.6 of the Zoning Bylaw, the Wellesley Planning Board, acting as Special Permit Granting Authority, will hold a public hearing on the application of Babson College, for a Special Permit for a Project of Significant Impact project located at 231 Forest Street, Wellesley, MA 02482 (also known as 6 Bryant Way). The proposed project will entail the redevelopment of an existing parking garage into a new Executive Lodge and Conference Center (the project), which will consist of approximately 77,600 square feet of hospitality space, including guestrooms, function/meeting areas, a fitness center and restaurant space.

The purpose of the Project of Significant Impact (PSI) Special Permit is to address off-site impacts of projects involving construction of 10,000 or more square feet of floor area in seven specific areas: water, sewer, storm drainage, electric power, solid waste, fire protection and life safety, and traffic and pedestrian safety. The permitting review is administered by the Planning Board in accordance with Section 5.6, Project Approval, of the Zoning Bylaw, and the Rules Relative to the Issuance of Special Permits adopted by the Planning Board.

Residents with any questions or who are seeking to participate in the hearing are encouraged to contact the Planning Director at earbeene@wellesleyma.gov prior to the meeting.

The submission and plans may be viewed on the Planning Department webpage at: http://wellesleyma.gov/1479/Planning-Board-Applications-Under-Review

Eric Arbeene, AICP

Planning Director

(WT-4/17/25 & 4/24/25)

Filed Under: Government, Legal notices

Wellesley Planning Board Notice of Public Hearing regarding 192 & 194 Worcester Street and 150 Cedar Street: Wednesday, March 19, 2025, 6:30pm

March 5, 2025 by admin

WELLESLEY PLANNING BOARD NOTICE OF PUBLIC HEARING ON A PROJECT OF SIGNIFICANT IMPACT SPECIAL PERMIT APPLICATION FOR PSI-24-01 – 192 & 194 WORCESTER STREET AND 150 CEDAR STREET

WEDNESDAY, MARCH 19, 2025, 6:30 P.M.

ONLINE VIRTUAL MEETING
https://www.wellesleymedia.org/live-streaming.html

The online meeting will also be streaming live and will be telecast live on Comcast channel 9 and Verizon channel 39. The meeting will also be recorded and available for later viewing on Wellesley Media.

The information to access the virtual meeting will be available on the Planning Board agenda, which will be posted at least 48 hours in advance of the Public Hearing. The agenda can be found at the following link: https://wellesleyma.gov/AgendaCenter/Planning-Board-15

In accordance with Chapter 40A, Section 9, of the Massachusetts General Laws, and Section 5.6 of the Zoning Bylaw, the Wellesley Planning Board, acting as Special Permit Granting Authority, will hold a public hearing on the application of Encore Properties Wellesley, LLC, 40 Warren Street, Newton, MA 02459 for a Special Permit for a Project of Significant Impact project located at 192/194 Worcester Street and 150 Cedar Street. The proposed project will entail the construction of a new three-story residential development, with 34 condominium units and 78 parking spaces.

The purpose of the Project of Significant Impact (PSI) Special Permit is to address off-site impacts of projects involving construction of 10,000 or more square feet of floor area in seven specific areas: water, sewer, storm drainage, electric power, solid waste, fire protection and life safety, and traffic and pedestrian safety. The permitting review is administered by the Planning Board in accordance with Section 5.6, Project Approval, of
the Zoning Bylaw, and the Rules Relative to the Issuance of Special Permits adopted by the Planning Board.

Residents with any questions or who are seeking to participate in the hearing are encouraged to contact the Planning Director at earbeene@wellesleyma.gov prior to the meeting.

The submission and plans may be viewed on the Planning Department webpage at: http://wellesleyma.gov/1479/Planning-Board-Applications-Under-Review

Eric Arbeene, AICP
Planning Director
(MW-2/28/25 & 3/3/25 and WT-3/6/25 & 3/13/25)

Filed Under: Government, Legal notices

2024 Annual Town Meeting notice

December 12, 2023 by admin

2024 Annual Town Meeting

The Select Board will convene the Annual Town at the Wellesley High School Auditorium on Monday, March 25, 2024, at 7:00 P.M.  The Warrant for the Annual Town Meeting will close at 4:00 pm on Thursday, December 21, 2023.

Any person desiring to have an article included in the Warrant for the Annual Town Meeting shall submit a petition signed by not less than ten (10) registered voters of the Town.  Any such petition shall be submitted to the Town Clerk for signature verification.

After being signed by the Select Board, the full text of the Annual Town Meeting Warrant will be available from the Select Board Office located temporarily at 888 Worcester Street, Suite 120 Wellesley, MA and on the Town’s website (www.wellesleyma.gov).

Motions to be offered to the Annual Town Meeting must be submitted digitally to the Select Board Office at sel@wellesleyma.gov by 5:00 pm on Friday, February 2, 2024.

 

WELLESLEY SELECT BOARD

Filed Under: Government, Legal notices

Legal notice: Town of Wellesley 2023 Annual Town Meeting

December 8, 2022 by admin

wellesley legal notice warrant

Filed Under: Legal notices

Town of Wellesley legal notice: Tax classification—Fiscal Year 2023

December 1, 2022 by admin

legal notice taxes

Filed Under: Legal notices

Wellesley legal notice: early voting

August 29, 2022 by admin

Early voting, Wellesley
Early voting, Wellesley

Filed Under: Legal notices

Next Page »

Tip us off…

Please send tips, photos, ideas to theswellesleyreport@gmail.com

Please support your local online news source with a tax-deductible donation by scanning the QR code
or by clicking on it.

QR Code

Advertisements

Wellesley Square Merchants
Wellesley, Jesamondo
Fay School, Southborough
Sexton test prep, Wellesley
Wellesley Theatre Project
Prepped and Polished
Perdocere, Wellesley
Wellesley HIlls Dental
Admit Fit, Wellesley
entering-swellesley-1
  • Bluesky
  • Facebook
  • Instagram
  • Twitter

Subscribe to our free weekday email newsletter

* indicates required

Follow Swellesley on Google News Showcase

The Swellesley Report has been selected to be highlighted on Google News Showcase. Please follow us there.

Most Read Posts

  • Bat Walk on Aug. 26th, sponsored by Wellesley Conservation Land Trust
  • Wellesley pays tribute to loooongtime DPW employee Smitty Rogers ahead of his retirement
  • Incoming: Teams rooms set to arrive at Wellesley High track and field this week
  • Wellesley High School drops to #35 in latest U.S. News rankings: What the numbers mean & how the community is reacting
  • With Solidcore and Degree Wellness on way to Wellesley, fitness vs. pastries arms race intensifies

Click on Entering Natick sign to read our Natick Report

Entering Natick road sign

Recent Comments

  • Bruce S. Pierce on Wellesley pays tribute to loooongtime DPW employee Smitty Rogers ahead of his retirement
  • Stevo Berg on Wellesley Police Dept. ends Flock license plate reader trial early amidst ‘overwhelmingly’ changed landscape
  • Joe Smith on Wellesley High School drops to #35 in latest U.S. News rankings: What the numbers mean & how the community is reacting
  • Nora Tracy Phillips on Wellesley High School drops to #35 in latest U.S. News rankings: What the numbers mean & how the community is reacting
  • Barry Braunstein on Wellesley High School drops to #35 in latest U.S. News rankings: What the numbers mean & how the community is reacting

Calendar

Upcoming Wellesley events

Upcoming Events

Aug 28
12:00 pm - 5:00 pm

Longfellow Wellesley Blood Drive

Aug 29
1:00 pm - 3:00 pm

Beyond Wellesley—Musical Matinee: The Band Wagon at Weston Newton Cinema

Sep 7
All day

Labor Day

Sep 8
7:00 pm - 8:30 pm

Welcome to the Graveyard (Wellesley library program)

Sep 10
7:00 pm - 8:00 pm

Wellesley Free Library presentation: “Massachusetts: The Library State”

View Calendar

Links we like

  • Danny's Place
  • Great Runs
  • Tech-Tamer
  • Universal Hub
  • Wellesley Sports Discussion Facebook Group

© 2026 The Swellesley Report
Site by Tech-Tamer · Login