
A developer and his team this week shared a proposal with the Wellesley Planning Board for 15 condos—three of them affordable based on Area Median Income—to be built on a collection of properties at 130-142R Worcester St. (Rte. 9 east) near the Sun Life campus. (See Wellesley Media recording for full presentation and discussion, about 17 minutes in).
This proposed three-story complex is a more modest reboot of a past pitch for a 40-unit apartment complex at the site under 40B zoning that cuts developers a break on local zoning rules. This project would add to housing units built or being built under different zoning rules along Rte. 9 in recent years, including Highland Park park (20 apartments at 680 Worcester St.) and the Bellweather (34 condos coming to 192-194 Worcester St.)
Whether developer Dean Behrend will be allowed to build 15 condos remains to be seen, as discussion during the meeting raised questions about the overall size of the property and the number of condos that are allowed in that space (a question was raised about what appears to be a strip of town property in between the developer’s properties). Behrend says he owns 130, 136, 140, 142 and 142R Worcester St., and that issues regarding the total property were sorted out during an earlier proposal to build there. He planned to clarify this after the meeting with members of his team.
Regardless of that, one challenge is that the property is zoned for general residence, and this project would require multi-unit residence zoning. The proponent may need to seek Town Meeting approval for a zoning map change via a citizen petition. The multi-unit residence zoning rules require no less than 3,000 sq. ft. per dwelling unit, so determining the actual total property owned by the developer is key.
The developer said plans are for 2- and 3-bedroom units ranging from 1,800 and 2,800 sq. ft with inside parking. A fenced-in play area would be one amenity, and the development would abut a heavily wooded area. He said the Metro West Regional Transit Authority has been contacted about having a bus stop in front of the location.
The design of this sort-of T-shaped building would include brick veneer, clapboards, and shingles.
It’s unclear what exactly next steps on this proposal would be, but the board gave Behrend and his team enough feedback to keep them busy for a bit.
No other residents spoke up about the proposal (note that the Planning Board agenda for the June 15 meeting listed the agenda item as “136 Washington Street Presentation” and not 130 Worcester St.).
Behrend is also working on a proposed 19-unit condo project at 592 Washington St. near Church Square at the other end of Wellesley.
More: Multi-family housing developments in the works













Gaya Beauty & Spa



